Bathroom, Kitchen, ADU Cost Overview
Thinking about a small bathroom remodel, master bathroom renovation, full kitchen remodel, or building a ADU (mother-in-law suite)?
We’ve got you covered.
Small Bathroom Remodel
-
-
Small hall bath with updated fixtures, tile walk in shower, frameless glass, modern one piece toilet and small contemporary vanity
Full Master Bath Renovation
-
-
Changing floor plans, adding plumbing, tub/shower location change, toilet relocation and large vanity
Complete Kitchen Remodel
-
-
Large kitchen with all wood construction cabinets, oversized stove and vent. Quartz with custom live edge 8’ custom island. load bearing wall beam replacement, modern farmhouse sink, all new lighting installed.
Accessory Dwelling Unit or Addition
An Accessory Dwelling Unit (ADU) is a separate dwelling unit on the same property as a single-family home that is smaller in size and regulated by the City of Austin’s Land Development Code § 25-2-774 Two-Family Residential Use. Some of the requirements for ADUs in the City of Austin are as follows:
Minimum lot size for ADUs on SF-3 zoned lots is 5,750 square feet.
Maximum size of an ADU is 1,100 square feet or 0.15 FAR whichever is smaller.
Buildings must be separated by a minimum of 10 feet (front to back and side to side).
An ADU requires parking be added in addition to parking requirements for the main structure (two parking spaces for a single-family home).
Use as a short-term rental is limited to a maximum of 30 days per year for ADUs constructed after October 1, 2015.
Use as a Type 2 short term rental is prohibited.
How long the ADU project take?
Typical Design and Permitting process will take about 3-4 months.
Build time varies depending on complexity of the project, but typically around 3-5 month from breaking ground.